EV Infrastructure for Luddon EV

Back to Commercial Case Studies

Project Overview

Installation of Luddon Construction EV Infrastructure to accommodate a new fleet of staff electric vehicles.

The Head Office site has now been equipped with a robust system of chargers to support its growing sustainability initiatives.

The installation includes:

  • New Feeder Pillar, Switchgear, 3 Phase Distribution Board, Cable Management, SWA, Civil Works 
  • 2 x 40kW Project EV chargers – Providing high-power charging for rapid turnaround. 
  • 4 x Dual 22kW Project EV chargers – Offering efficient charging for multiple vehicles simultaneously. 

All chargers are fully integrated with a viewing and load management program incorporated, ensuring real-time monitoring and optimised energy distribution. 

This project was partially funded through the Workplace Charging Scheme (WCS) Grant, reducing installation costs and supporting the transition to cleaner transport solutions. 